Occams Advisory · SDR / BDR Report Dashboard
BDR Performance Report
Mumbai & Dehradun pods · August & September 2026 · pipeline to 2 October
Data cut-off: 1 Oct 2026
Designed & managed by Varun Kumar
4 → 3 → 2 → 0
Demo set → done → sent → signed
All from Vineet and Paramdeep
1 / 48
Held meetings in Sep
6 RDC BDRs × 8 quota
Calls, Aug – Sep
Talk time, Aug – Sep
Average calls / day

Team overview

Efforts against closures for August and September. Average calls per day = total calls ÷ 40 aligned days (20 a month). Talk time and emails per day are divided by the days the BDR logged in. ★ Top 2 highlights the two strongest BDRs per site: Dehradun on demos and agreements, Mumbai on average calls per day.

Site-wise breakdown by BDR: August & September

Each month has 20 days aligned. Days calling made = working days with at least one dial. Average calls / day = total calls ÷ total days aligned. Dialing hours are first-to-last dial on each calling day; average dialing is per day calling was made. Each cell shows the August + September total, with the monthly split underneath. Target quota = held-and-accepted meetings against the September BDR quota of 8 (quota starts in September). ★ Top 2 highlights the two strongest BDRs per site.

August call data starts 10–17 August (17 Aug for Paramdeep), so August days calling made and average calls are understated for everyone. Adding the early-August RingCentral exports will correct them.
BDRDays calling made
of 40 aligned
CallsAverage calls / day
calls ÷ days aligned
Call target-
40 / day
Dialing hAvg dialing h / dayTalk hEmailsDemos booked → completed
by month booked
Target quota
held meetings vs Sep quota (8)

Calls include Kelly Dancer AR dials. Standard login is 8 hours × 20 days × 2 months = 320 hours per BDR. Bars on average calls / day mark the 40-call target.

Active Lead Journey

Every BDR who has set a demo, with each account from demo set onwards. Hover a step for detail; amber "Pending" marks the next step for live leads; blank means not reached yet. BDRs with no demo set are not listed.

Team memberCompanyDemo setDemo completedAgreement sentAgreement completedDays
Paramdeep Singh
Dehradun
Cooper Aerial Surveys Co
Ext ERC Client Outreach
Demo setTue, Sep 29 Demo completedTue, Sep 29 Agreement sentTue, Sep 29 PendingSignature3
Vineet Goswami
Dehradun
The Solutions Consulting Group
ERC|RDC Assigned Accounts
Demo setTue, Sep 29 Demo completedThu, Oct 1 PendingCPA review3
Galli Engineering P.C.
RDC Self-Sourced
Demo setWed, Aug 12 Demo completedWed, Aug 12 DisqualifiedWed, Aug 120
Breakers Point Inc (Moana Chips)
ERC|RDC Assigned Accounts
Demo setMon, Sep 21 No-showThu, Sep 24 11

Days = demo set to 2 Oct for open leads, or to the loss date. Craftech Metal Forming (Paramdeep) had an agreement sent without a demo, so it is not listed.